General Information
Admiralty Chart: 3409
Position: Lat 26O 47’ N / Long 53 O
20’ E
Location: Approx 7 Miles off the mainland coast of Iran
Water density: 1.028
Tides:
In the range of 1 to 2.20 Meters.
Vessels should approach from the South which is open and
free of danger.
Anchorage:
About 2 miles East of the oil loading dock
Medical Facilities: Available for emergency cases.
Water & provisions: Not Available.
Cargo: Lavan Blend Crud Oil
Supplier/Operator : Iran Offshore Oil Company. (IOOC)
Pilotage is compulsory. Pilot boards vessel at anchorage.
Working hours: 24 hours a day.
Berths at Lavan Island
Jetty
Lavan Jetty consists of 2 berths with an overall length of
378 meters. The outer berth (No.1) enjoys a water depth of
21.l3 Meters above CD, while the inner berth (No.2) has a
water depth of 19.88 M above CD.
The capacity for berth No.1 is 150,000-225,000 MT DWT, Max
arrival displacement 120,000 MT with maximum sailing draft
of 19.20 M. And for berth No.2 a DWT of 25,000-65,000 with
maximum sailing draft of 10.35 Meters.
Connections: Normally 3 x 16” arms
Rate of loading: 35,000-45,000 BBLS/Hr
Side alongside: Normally starboard side alongside at both
berths.
SBM
Position: Lat 026O 45.5’ N / Long 053O
20.8’ E
Maximum Allowable DWT: 300,000 Tons
No restrictions in terms of arrival displacement, height of
manifold, LOA, and draft.
Water depth at SBM is about 40 Meters.
Berthing operations are carried out during daylight only.
No oily discharge from any source is allowed, and clean
ballast & pipelines must be ensured.
Necessary arrangements should be made to accommodate on
board at least seven (7) terminal staff while vessel is
secured to SBM.
Vessels calling Lavan SBM must be equipped with the
following:
Operational Inert Gas System.
Operational ODME (Oil Discharge Monitoring Equipment).
Approved type of bow fitting for SBM mooring.
Crane or derrick on each side of mid-ship with minimum SWL
of 10 Tons for handling cargo hoses.
Accommodation ladders in good condition on both sides.
2
x 16-inch cargo manifolds on each side (Port and Starboard)
Two smith brackets on forecastle head one on each side (port
and starboard).
EDP at Lavan Island
Early Departure procedure (EDP) is
available at both the jetty and Lavan SBM. Vessels not
sailing on EDP basis must wait for 2-3 hours after
completion of loading to collect cargo documents.
|