|
POSITION
Latitude
27 11’ N
Longitude
56 16’ E
Anchorage
Latitude
27 4.34’ N
Longitude
56 9.25’ E
Rajaee
Port
The 6500-meter approach channel has a width of 249 meters
and a depth of 13.5 meters and is navigable for two
ocean-going vessels at the same time.
There are 24 jetties at the port of Rajaee:
Berths 1 & 2 have max drafts of 11.20 meters and accommodate oil
tankers.
Berths 3 & 23 accommodate vegoil tankers with max drafts of 10.70
meters. Also, berth 24 with a max draft of 11.5 meters can
accommodate vegoil tankers.
Berths 4, 5, 6, 7 & 8 accommodate container ships with max drafts
of 12.2 meters.
Berth 9 is reserved for small vessels & barges with max drafts of 5
meters.
Berths 10, 11, 12, 13 & 14 service general cargo vessels with max
drafts of 12 meters.
Berths 15, 16, 17 & 18 service container & bulk cargo vessels with
max drafts of 13.6 meters.
Berths 19, 20, 21, 22 & 24 are set aside for general cargo ships
with max drafts of 11.5 meters.
Cranes
(General Cargo)
1 x 500-ton heavy crane (Available only at berths 23 &
24).
6 x 140-ton heavy cranes (Available at all general cargo
berths except berth 3).
7 x 12-ton rail cranes (Available only at berths 10 to
14).
Container Terminal 1
Gantry Crane Operations
No of Berths: 5 berths (4-8)
No of Gantry Cranes: 10
Capacity of Cranes:
(5 x 35 MT - 5 x 45 MT)
Max Draft: 12.2 Meters
Max LOA: 290 Meters
Max rate of discharge: 35-40 per hour
Max rate of loading: 15-20 per hour
Mobile Crane Operations
No of Berths: 4 berths (15-18)
Max Draft: 12.5 Meters
Main Container Yard (CY): 32.2 Ha
(322,000 M2)
CFS (Container Freight Station)
Area: 14,000 M2
Yard Equipment (Owned by the PMO)
RTG (Rubber Tired Gantry): 23 x 35
Tons
Reach Stacker : 10 x 30
Tons
Top Lift : 5 x 30
Tons
Yard Equipment (Owned By Tidewater)
Rubber-Tired Gantry (RTG): 2 x 45 Tons
Reach Stacker : 19 x 45 Tons
Empty Stacker : 11 x (7 Stack)
Total Terminal Facilities
Gantry Crane : 10
Rubber-Tired Gantry (RTG): 25
Reach Stacker : 29
Empty Stacker : 11
Top Lift : 5
Mobile Crane : 5
Tidewater is running three private
terminals of about 10-12 hectares each, with stuffing,
storing full and empty containers, stripping, cargo
warehousing etc done by RTGs, reach stackers, empty
stackers, trucks, heavy and light lift trucks operated by
skilled manpower. These three terminals also include covered
areas for storing sensitive cargos as well as 100 reefer
plugs for reefer containers.
Container Terminal 2
No of Berths: 4 berths (25-26-27-28)
No of Gantry Cranes: 8
Capacity of Cranes: 65 Tons
Draft of Berths: 13 Meters
Bahonar
Port
(the Old Port)
There are 6 jetties at the port of Bahonar four of which
cater to tug boats and fishing boats, with the other two
berths enjoying max drafts of 10 meters set aside for export
of sulfur and Bitumen.

|